ROCKETS AND ARTILLERY 
 | 
  
   
STATUS 
 | 
  
   
INDUCTION INTO SERVICE 
 | 
 
| 
   
BRAHMOS Supersonic Cruise Missile 
 | 
  
   
Army has placed order for three regiments of Brahmos.
  Sanction for 4th regiment awaited. Upgraded Block III Brahmos has undergone
  successful series of trials. 
 | 
  
   
Two regiments with Brahmos are  
fully operational. Third regiment  
of Brahmos to be deployed in  
Arunachal Pradesh. 
 | 
 
| 
   
M777 Ultra Light  
Howitzers 
 | 
  
   
MoD delay has pushed back purchase of 145 M777 155mm / 39
  calibre Ultra Light Howitzer’s, pending since 2010. Cost has now increased
  from USD 647 million to USD 885 million. 
 | 
  
   
If an order is placed by 2015-2016,  
then first guns would be delivered  
by 2017-2018, with deliveries 
 being completed by
  2020 for 5  
regiments. 
 | 
 
| 
   
Ordinance Factory Board 155/45mm calibre Dhanush artillery
  gun 
 | 
  
   
Ordinance Factory Board displayed 155/45mm calibre Dhanush
  based on original Bofors drawings at Defexpo 2014.   OFB has received
  indent for 114 units of 155mm x 45 calibre Artillery guns   
 | 
  
   
Trials ongoing, likely to be  
completed by 2015. All 114 guns  
are to be delivered to the Army  
within a maximum of 36 months  
from accord of Bulk Production  
Clearance   
 | 
 
| 
   
Towed Gun Systems (TGS) and Mounted Gun System (MGS) 
 | 
  
   
Has been declared a ‘Make and Buy’ for 1800 systems. 
  Winner yet to be declared. 
 | 
  
   
2016-2018 
 | 
 
| 
   
ARMOUR 
 | 
  
   
STATUS 
 | 
  
   
INDUCTION INTO SERVICE 
 | 
 
| 
   
T-90 S ‘Bhishma’ Main Battle Tank (MBT) 
 | 
  
   
59 armoured regiments to be equipped with around 1600
  tanks (1000 to be manufactured in India). 
DAC has cleared manufacture of 235 T-90 tanks at HVF Avadi.  | 
  
   
Already in operation.   Substantial  
numbers of T-90’s to be upgraded  
with improved sighting, navigation 
 and fire control
  systems 
 | 
 
| 
   
T-72 M1 ‘Ajeya’ MBT 
 | 
  
   
The fleet of T-72 tanks is being upgraded with Thermal
  Imager Stand Alone System, improved engines and Auto Land Navigation System
  for Command and Control Tanks. 
 | 
  
   
Upgraded T-72 tanks are entering  
service and with life extension to  
remain operational beyond 2025 
 | 
 
| 
   
Arjun MBT Mk-1 
 | 
  
   
All 124 tanks have been delivered to the Indian Army. 
 | 
  
   
The 43rd armoured regiment at  
Jaisalmer and 75th armoured  
regiment are fully operational with  
45 tanks each. 
 | 
 
| 
   
Arjun MBT Mk-2 
 | 
  
   
Orders for 118 Arjun Mk-2 likely to be obtained next year.
  Trials expected to be completed this year 
 | 
  
   
If orders placed next year,  
deliveries will begin in 2018.  
Production rate of 30 tanks annually being targeted. 
 | 
 
| 
   
Future Infantry Combat Vehicle (FICV) 
 | 
  
   
Make India project has requirement for 2,600 FICV’s.
  Project approved in 2009. 
Contenders are Mahindra, L&T, Tata Motors and OFB.  | 
  
   
An indigenous FICV will require  
at least 3 years to enter production.  
The large numbers mean that  
obsolete BMP2/2K will be  
replaced only by 2030. 
 | 
 
| 
   
BMP-2/2K ‘Sarath’ 
 | 
  
   
Indian Army looking to upgrade BMP-2/2K to BMP-2M standard
  without replacement of existing turret. 
 | 
  
   
Large numbers and delays in the  
upgrade mean that the entire fleet  
upgrade for approximately 1,400  
BMP’s would be complete only  
by 2025! 
 | 
 
| 
   
SMALL ARMS, ANTI TANK AND AIR DEFENCE 
 | 
  
   
STATUS 
 | 
  
   
ENTRY INTO SERVICE 
 | 
 
| 
   
Indian Small Arms System (INSAS) Rifle replacement 
 | 
  
   
To be replaced through global route. Request for Proposal
  issued in November, 2011 for 60,000 assault rifles. Field trials underway. 
 | 
  
   
Induction likely to begin 2016  
onwards. Transfer of Technology,  
will see Indian ordnance factories  
manufacture 1, 40,000 rifles. 
 | 
 
| 
   
Close Quarter Battle Carbines 
 | 
  
   
Requirement for 43,000 carbines. 
 | 
  
   
NA 
 | 
 
| 
   
3rd generation Anti Tank Guided Missile (ATGM) 
 | 
  
   
Israeli Rafael Spike & Raytheon/Lockheed Martin
  Javelin in contention for order of up to 2000 launchers with 24000 missiles. 
 | 
  
   
NA 
 | 
 
| 
   
Very short-range air-defence system (VSHORADS) 
 | 
  
   
Tender underway since 2010. Competitors are MBDA Mistral,
  Saab RBS 70 NG and KBM Igla S for an order of close to 1000 launchers with
  6000 missiles initially.  Raytheon’s Stinger also on offer. 
 | 
  
   
NA 
 | 
 